We started the monitoring of state of the Bílovka River
channel restoration. Bílovka River has undergone a rapid regulation works (with
straightening and bank stabilization) in the last 40 years. Now, especially PLA
Administration Poodří (link) and Povodí
Odry Enterprise (link in Czech) are starting with returning
of the Bílovka River to naturally meandering state of channel in the area of
the PLA Poodří.
Bílovka River restoration project was realized between the
years from 2011 to 2013. It was based on the amount of financial resources, the
Operational Programme Environment (OPE, link) which is the
second largest Czech operational programme. The project was projected to cost
480 million CZK and realized by Povodí Odry Enterprise (link in Czech) with cooperation of Talpa – RPF (link in Czech).
Restoration of the Bílovka River was based on reconstruction of meandering
channel.
The first part of monitoring is based on the measurement of
channel morphology for modelling of hydrological situation, monitoring of
channel changes morphology, etc.
Bílovka River channel morphology measurement
No comments:
Post a Comment
Komentáře a reakce vulgárního charakteru nebo netýkající se problematiky zaměření tohoto webu budou automaticky smazány.
Non-related comments/posts of the current topics as same as comments/posts of vulgar nature will be deleted.